(708) 290-7775 Request a rate →
Chicago drayage insights

From the Ship to the Shelf.

This page follows a box the way it travels: across the ocean, through the ports, by rail to Chicago, onto a Chicago ramp, onto our truck, and into the store or warehouse. At each stop you get the number, why it matters, what it does to the next stop, and what it means for your box. The last stop, the store, is where the next order starts.

Loading
  1. 1Ocean
  2. 2Ports
  3. 3Rail
  4. 4Chicago ramps
  5. 5The truck
  6. 6The store
  7. ✓The result
1
Stop 1 of 6 · where it begins, across the water

The ocean: how full the ships are.

What it costs to move a box from Asia. Rising rates mean the ships are full and more freight is coming; falling rates mean there is room on board.

Source: Drewry World Container Index, weekly.

Why it matters

The ocean rate is the earliest public read on volume. Shippers book more when the ships fill, and the rate follows.

Right now

Loading

What it does next

Shanghai to the West Coast is about two to three weeks on the water. Next stop: the ports, where the boxes come off the ships.

2
Stop 2 of 6 · off the ship

The ports that feed Chicago.

Loaded imports are the boxes that end up on a train to Chicago. The forecast shows what is still on the water and coming.

Port by port.

Containers each port posted for its latest month, in TEU (one 20-foot box). Ports post on their own schedule, so the months differ.

PortTotal TEUTEULoaded importsImportsvs a year ago1 yr

Ten years of port volume

Why it matters

What lands at the ports now is what reaches the Chicago ramps next. The forecast tells you whether the next months run above or below last year.

Right now

Loading

What it does next

Boxes bound for the Midwest leave the port by train. Next stop: the rail, and how fast it is moving them.

3
Stop 3 of 6 · on the train

The rail into Chicago.

How many containers the railroads are moving, how long the trip takes, and how backed up the Chicago yards are.

The Chicago rail gateway.

What the railroads report to the Surface Transportation Board every week. Yard dwell is how long a rail car sits in each Chicago yard, a good read on how backed up the gateway is. The train speeds are for intermodal trains, the ones carrying containers.

Hours a rail car sits in each Chicago yard
Intermodal train speed, miles per hour

Why it matters

Busy trains and long yard dwell mean boxes reach the ramps late and in bunches. Bunches are what fill a ramp and burn free time.

Right now

Loading

What it does next

The train grounds the box at a Chicago ramp and the railroad's free time starts. Next stop: the ramps.

4
Stop 4 of 6 · on the ground

The Chicago ramps.

Where the box becomes a truck move. Gate notices, what each ramp sends, and what shippers are asking to move, from our own work across every Chicago ramp.

Where our Chicago work comes from.

Share of our rail pickups and returns by ramp
Imports and exports

Where the boxes go.

States we deliver to from the Chicago ramps. Darker means more of our work.

    Why it matters

    Each box on the ground needs a truck, a chassis and a driver before the free time runs out. Rate requests show how much of that is being planned.

    Right now

    Loading

    What it does next

    The box needs a truck. Next stop: the trucking market, which decides what the last miles cost and how fast they happen.

    5
    Stop 5 of 6 · the last miles

    The truck: capacity, diesel and drivers.

    The local truck move from the ramp to the dock. How tight trucks are, what diesel costs, and what is moving drayage right now.

    Diesel and freight volume.

    The government and industry numbers behind truck costs and truck demand.

    Source: FRED, Federal Reserve Bank of St. Louis (EIA, Cass, BLS, ATA), last 26 readings.

    Why it matters

    When trucks are tight, rates rise and a late booking waits. Diesel moves the fuel surcharge on every load.

    Right now

    Loading

    What it does next

    The truck backs the box into a dock. Next stop: the store, where the goods sell and the next order gets placed.

    6
    Stop 6 of 6 · where it ends, and starts again

    The store: inventory and demand.

    The goods land on a shelf or in a warehouse. How much stock is on hand and how fast it sells decide the next orders, and the next boxes on the water.

    Why it matters

    Sales empty the shelves and restocking orders refill them. Strong spending and lean stock mean more orders, and those orders become the next ocean bookings.

    Right now

    Loading

    What it adds up to

    The loop closes: new orders sail and the trip starts again at stop 1. Put the six stops together and you get the result.

    ✓
    The result

    What it means for your box.

    What to do about it
    • Book the pull before the box lands, not when the free time is half gone.
    • Tell us early about overweight and 20-foot boxes: they need a tri-axle chassis, and some states need a permit.
    • Check the ramp notices in stop 4 before you plan around a holiday.
    • Watch stop 1 and stop 2: when ocean rates and the import forecast turn, the Chicago ramps follow a few weeks later.

    Request a rate →

    We pull from every Chicago ramp, with our own chassis and two secured yards. Tell us the ramp and the zip, and we will come back with a rate.